Projects

SIAAP – Coagulation, Flocculation and Clarification

1 / 4

Modernization project for the coagulation–flocculation–clarification section of the Seine Aval wastewater treatment plant (SIAAP).

Structural design of the HTA (medium-voltage) substation as part of the reconstruction and modernization project of the Clarifloculation sector at the Seine Aval wastewater treatment plant (SIAAP), aimed at increasing treatment capacity and improving the safety and reliability of the facilities.

Scope of services:

  • Structural analysis and design of reinforced-concrete structures in accordance with the Eurocodes.
  • Preparation of formwork and reinforcement drawings.
  • Review and verification of structural calculation reports.
  • Technical coordination with the electrical, civil engineering and BIM teams.
  • Monitoring and ensuring compliance with the project's technical requirements and standards.